Columbia Market House

Work on the Columbia Market commenced on October 12, 2009 with a 120 day project schedule, since this is a “working” market with stand holders open for business on Thursdays and Fridays, work is to be done in 10 hour days, Monday through Wednesday with Saturday and Sunday optional work days. Historic Restorations is restoring the fourteen original windows. On site the entire windows are removed and the openings are secured with plywood, in the shop the old glass is gently removed, cleaned and labeled for re-installation at the end of the process. The wood mullions, rails and stiles are stripped of their old paint and sanded in preparation for a fresh coat of paint. Any rot or damaged wood is repaired or replaced, if necessary. After one coat of primer the windows are reunited with their original glass and any extra glass that may have been purchased to replace broken panes . Meanwhile, on site in Columbia, the exterior and interior window trim is being prepared to receive the refurbished windows, wood filler, sanding and missing pieces are used to create an exceptionable frame and architectural detail for form and function. Today Historic Restorations is about half way through our portion of this project, we are thrilled with the transformation and honored to be a part of this historic buildings story. If you ever get to this little river town, on a Thursday or Friday, stop by the Market, the oldest in the United States or have a virtual visit, www.columbiahistoricmarkethouse.com